CHINWL #: 506541001 50654-1001
Mfr. #: 506541001 50654-1001
Wanlian part number: |
506541001 50654-1001 |
Original number: |
506541001 50654-1001 |
Gender: |
Female |
Specification: |
Copper Alloy, Brass, Phosphor Bronze, Nickel. |
Type: |
Terminal |
TUV, TS16949, ISO14001, ISO 9001, RoHS conform: |
Yes |
MOQ: |
No minimum order quantity |
Supply sample: |
Yes |
Customized drawing with Decal, Frosted, Print are available as request |
Yes |
Payment method: |
We accept Paypal, TT, Alipay, West Union etc. |
Transportation method: |
Air Transport: UPS, DHL, FEDEX etc; Sea Transport; Railway Transport; Freight Forwarding etc. |
Production Capacity: |
1000000pieces/Month |
Use the tools created specifically for this purpose to modify, and repair the defect without affecting the quality of other components. After repairing the drawing, the wiring test process of restoring all functions.
After the test shows that the wiring can perform all the functions, the label that confirms this fact and puts it on the wiring. Packaging wiring is also an artificial process. The method of completing the deployment, the type of box for transportation, and the number of wires stored in the box are determined by the specifications with the customer (automobile manufacturer).
The chart in Figure 9 highlights the logistics process of dynamic loading, and outlines how manual and automatic processes are combined in wiring production.
4 Wire Bidding Process Optimization Case Study
The case study aims to determine the main factor of the dynamic assembly line productivity in the production of wire beam. To this end, the theoretical structure of the following assembly line is defined in the Witness Horizon software:
13 construction segments: 10 assembly sections, 2 testing sections, and 1 packaging section;
Nine buffers: 5 buffers are used to store meta devices, 1 buffer is used to store the cable before testing, and 1 buffer is used for each test section to store the line beam that is not passed. The buffer area is used to place the wiring beam before the packaging;
Install the conveyor belt under the assembly board to ensure that the beam branch is transported from one segment to another;
The assembly line is provided by 19 operators.
It simulates 8 hours a day, 5 days a week, that is, a single -shift system of 2400 minutes.
After the simulation, it is noticed that the free time of each segment gradually increases after the work section 4, and the percentage of 97.56% in the last section reaches 97.56%.
Simple instructions:
We have product Catalogue,please contact us on skype,WhatsApp or Email.
If you can't find a product on our website or catalog, We deal with over 10,000 items, our catalog doesn’t cover all products. And we are developing 100+ molds yearly, which means around 10 new products are created in our factory. So don’t go away, just send us your photo or part no, we’ll check for you.