products
Connect Clips / 7047-9580 Car Connector Wire Harness Plug Wire Clip Fixing Buckle Aircraft Buckle

7047-9580 Car Connector Wire Harness Plug Wire Clip Fixing Buckle Aircraft Buckle

Wanlian #:

Mfr. #: 7047-9580

Online Inquiry

    Wanlian part number:

    

    Original number:

    7047-9580

    Color:

    Yellow  

    Type:

    Clip

    TUV, TS16949, ISO14001, ISO 9001, RoHS conform:

    Yes

    MOQ:

    No minimum order quantity

    Supply sample:

    Yes

    Customized drawing with Decal, Frosted, Print are available as request

    Yes

    Payment method:

    We accept Paypal, TT, Alipay, West Union etc.

    Transportation method:

    Air Transport: UPS, DHL, FEDEX etc; Sea Transport; Railway Transport; Freight Forwarding etc.

    Production Capacity:

    1000000pieces/Month


7047-9580





2 Low -voltage beam production process process and requirements

1) Circuit cutting and wire marking (wire number). Among them, the wire cut is based on the batch nature of the cutting marker of the wire (according to the number of models of the production plan). The wire marking (wire number) is based on the wire detail table according to the technical requirements.

Process requirements: The length of the wire cutting is suitable for the terminal length of the terminal. After cutting, the insulation peel is not damaged or fractured in the inside of the inside of the inside.

2) Separation. After the wires of the same line number are cut, each wire is divided into a set of wire beams.

Process requirements: After straining the wires of the same line number, they are packed with a split -line workplane board. The wires that form the beam are placed on the phenomenon of the line frame, and the logo is smooth, the wiring beam is smooth, no twisting, messy and other phenomena.

3) Cut the ripples, heat pipes, and glue heat pipes. The wavelet tube is cut with scissors according to the specifications and lengths of the process requirements. The thermal shrinkage and the heating tube with the tube of the tube are cut according to the specifications and lengths of the process, and the automatic computer cutting machine is cut for cutting.

Process requirements: The ripple tube, thermal shrinkage, and the glue thermal shrinkage tube are cut according to the prescribed size.

4) assembly line beam. The wire combination is divided into the first branch beam in accordance with the requirements of the drawings and process, and then wearing a closed -mouth ripple (weaving network) and a tubing heating tube for wiring beam protection. And wearing a closed -mouth ripple tube (weaving net) and a tube with a glue -tube for wiring beam protection. The branches are fixed with tapes, and the wiring bundles that combine the main trunk and branches are finally formed.

Process requirements: The size of the tube tube cutting is the size of the drawing requirements+the length of the heat shrinkage pipe of the branch; after the closure of the branch of the branch is fixed, the branch point size and the beam size meet the drawings requirements.

5) The branch point is fixed and seized. After wrapping the tape with tape, the wire beam branch is fixed, and the thermal shrinkage of the heating tube is used to protect the heat. The gap between the thermal shrinkage and the beams of each branch is filled with 703D glue.

Process requirements: The ripples at the branch point are firmly fixed, the tape has no external leakage, and the 703D glue has no overflowing phenomenon. The 703D silicon rubber seal is completed in 2 to 3 times. The surface of the irrigation is uniform and smooth.






Simple instructions:

We have product Catalogue,please contact us on skype,WhatsApp or Email.

If you can't find a product on our website or catalog, We deal with over 10,000 items, our catalog doesn’t cover all products. And we are developing 100+ molds yearly, which means around 10 new products are created in our factory. So don’t go away, just send us your photo or part no, we’ll check for you.

grey