Wanlian #: WLD-026
Mfr. #: 7165-0349 7158-3008-80
Size: L: 8.7mm ID: 1 OD: 5.6
Material:Silicon
Wanlian part number: |
WLD-026 |
Original number: |
7165-0349 7158-3008-80 |
Color: |
brown |
Operating Temperature range: |
-40℃~125℃ |
Application: |
Waterproof sealing for Automotive connector and Wiring Harness |
Specification: |
The silicone oil,High tear resistance,OEM |
Type: |
Single Wire Seal (SWS) |
TUV, TS16949, ISO14001, ISO 9001, RoHS conform: |
Yes |
MOQ: |
No minimum order quantity |
Supply sample: |
Yes |
Customized drawing with Decal, Frosted, Print are available as request |
Yes |
Payment method: |
We accept Paypal, TT, Alipay, West Union etc. |
Transportation method: |
Air Transport: UPS, DHL, FEDEX etc; Sea Transport; Railway Transport; Freight Forwarding etc. |
Production Capacity: |
1000000pieces/Month |
Advantage: |
High qualified mold design, smooth appearance, no flash, for automatic crimping machine |
Purpose: |
Dustproof,Waterproof |
9) Make labels. Paste the PET non -dry glue name tag at the end of the wiring end; stickers on the plastic bag and carton on the line beam assembly; the two labels are printed with a printer and pasted.
Process requirements: The label width and wiring beam are parallel to the wiring beam when pasted, and the label is not crooked. The overlapping tag is aligned and the label is flat. Paste the movement once to avoid the position of the position that is not properly revealed during the paste process. The surface of the label is flat, without wrinkles, and edges.
10) Wire beam inspection. Large quantitative models of models are made of wire beam guide, connected to the pirate instrument for conducting detection; small -batch production models are conducted with a multimeter for conducting detection.
Process requirements: Each wire beam assembly must be performed by wire beam to detect. The points of each wire are correct, and there is no short -circuit, disconnection, and virtual connection.
11) Inspection. The detailed introduction is as follows.
First inspection: Create the terminal pressure testing of the terminals before pressing various types of terminals, report to the inspection department for inspection, and truthfully fill in the tensile test record table, one formula, the inspector signed, and the inspection department will be reported. share.
Self -inspection: After the production of the line is made, the self -inspection is performed, and the self -inspection form is well filled in.
Three inspections: terminal pressure connection, terminal welding, terminal plugging, and connection connection to the self -inspection process for video multimedia records. The operator of the same process conducts other inspections, and the inspector conducts the multimedia records.
Full inspection: The appearance, size, and wire beam assembly of each set of wire beams are inspected by the inspector.
Process requirements: Strengthen the test process inspection of the wiring beam, the inspection process is strictly executed by the assembly of each wire beam, and the inspection records are truthfully fill in.
Simple instructions:
We have product Catalogue,please contact us on skype,WhatsApp or Email.
If you can't find a product on our website or catalog, We deal with over 10,000 items, our catalog doesn’t cover all products. And we are developing 100+ molds yearly, which means around 10 new products are created in our factory. So don’t go away, just send us your photo or part no, we’ll check for you.