Wanlian #:
Mfr. #: JST08T-JWPE-VSLE
Wanlian part number: |
|
Original number: |
JST08T-JWPE-VSLE |
Gender: |
Female |
Specification: |
Housing: PBT+G; PA66+GF; PA66; PBT; Nylon |
Type: |
Connector |
TUV, TS16949, ISO14001, ISO 9001, RoHS conform: |
Yes |
MOQ: |
No minimum order quantity |
Supply sample: |
Yes |
Customized drawing with Decal, Frosted, Print are available as request |
Yes |
Payment method: |
We accept Paypal, TT, Alipay, West Union etc. |
Transportation method: |
Air Transport: UPS, DHL, FEDEX etc; Sea Transport; Railway Transport; Freight Forwarding etc. |
Production Capacity: |
1000000pieces/Month |
2.5.5 Maintenance
When checking the voltage or lead of the line, you generally do not have to take off the insert device, and only use the multimeter to insert into the thread hole at the tail of the insert device for inspection.
(1) If you need to replace the wire or remove the wiring terminal of the plug in the maintenance and repair of the ordinary plug, you should first separate the plugs and sockets, and insert it in the thread hole of the plug or the tail of the socket with a dedicated tool (or a small screwdriver). , Pry up the locking of the wiring terminal and pull the wire out of the back end .
Fig
Before the new wiring terminal is installed, first check whether the locking of the terminal of the wiring terminal is normal. If it is abnormal, you can adjust it according to the method shown in the figure below.
During the installation, push the wire with the wiring terminal until the terminal is locked, and then pull the wire backwards to confirm whether it is locked .
Installed terminals
(2) The maintenance of the lock-locking wedge connection device is pulled out of the locking wedge directly with a pointed tongs .
Use a special tool to remove the lock film from the injection, loosen the lock, and pull out the wire .
loose locks and pull out the wires
Test about 120mm wires and wiring terminals, peel off the insulation layer with a length of 6mm .
Put the naked wire into the docking plug-in, and press the wire with a stroke tightly .
Press the wires with pressure wire tight
Put the thermal shrinkage into the maintenance of the wire and heat the heat shrinkage tube with a hot air gun .
Heat the heat shrinkage tube with hot air guns
Re-load the wires and wiring terminals into the plug-in, and install the lock wedge in place .
Simple instructions:
We have product Catalogue,please contact us on skype,WhatsApp or Email.
If you can't find a product on our website or catalog, We deal with over 10,000 items, our catalog doesn’t cover all products. And we are developing 100+ molds yearly, which means around 10 new products are created in our factory. So don’t go away, just send us your photo or part no, we’ll check for you.